In order to overcome the problems of punching failure in flat slabs and the foundations, Schöck developed the BOLE® stud rail reinforcement system. The double ended head ensures optimum force absorption in comparison to conventional solutions such as hoops, thereby permitting increased loads. The BOLE® reinforcement system is installed between the top and bottom mats. The adjustable support stands make it very easy to insert and seat the BOLE® element through the matting directly onto the shuttering.